Print

4.75 in. LWD FULLSET (MWD/GR/Resisitivity/Neutron/Density) services continue drilling 1043 m in Middle East

Jan/9/2019, in Middle East, our team had done a successful LWD FULLSET (MWD/GR/Resisitivity/Neutron/Density) services in 6.125 in. hole. The well TD was 3600 m and drilling interval was 1043 m.