RIT-OBM/USI/GR job by PCL
On 30th Apr 2017, the RIT-OBM/USI/GR job was done with PCL method
successfully in Middle East. The well bottom depth is 4340
meters and the maximum deviation is 70 degrees. The toolstring is good
centralized in the hole and the client accept Renhe logging data.