Print

ComLWD (GR+Resisitivity+Neutron+Density) Operation Success in Middle East

On March 31st, 2017, in Middle East, our team has carried out a successful job of PI Integrated LWD system in 6.25 in. hole with total depth of 4030 m and logging interval of 500 m. This is first time for us to run Logging-While-Drilling (LWD) Neutron and Density in Middle East market.