Print

LWD Records

Jan/09/2018, MWD/Neutron/Density/Resistivity/Gamma Tools drilled 850 meters, 120 hours including one trip in 8.5 inches hole section in Persian Gulf, it is the longest drilling interval record in one run by RENHE GROUP fullset tool.