Print

4.75 in. LWD FULLSET Tools continue drilling 1043 m in Middle East

Jan/9/2019, in Middle East, our team had done a successful LWD FULLSET (GR+Resisitivity+Neutron+Density) job in 6.125 in. hole. The well TD was 3600 m and drilling interval was 1043 m.