Micro-seismic Real-time Monitoring
From 2020.3.23 to 2020.4.9, Geo-Vista operation team had successfully finished the micro-seismic real-time monitoring operation and related data interpretation job for two shale horizontal gas wells in Sichuan Province, China. The number of fracturing layers of the two treatment wells is 19, and the interval depth is 3360 m-3580 m with 138 degC in the monitoring well. Within 17 days, operation team had finished real-time fracturing monitoring work and quick look interpretation at the wellsite.