FULLSET/MAA/RIT-OBM/USI/NMR job under tough situation
On 8 Jul 2017, the FULLSET with Dipole Array Acoustic and
Array Induction/Resistivity Imaging-OBM plus Ultrasonic Scan Imaging/Nuclear
Magnetic jobs were successfully done in Middle East. There is no enough space
for loading logging unit in the working zone, the wireline logging unit have to
be put on the main deck which is under the cat walk, although, the winch man
cannot see the well head (see pictures).
After two days, the job was done successfully, all the
tools which manufacture by Beijing GEO-VISTA Technology Ltd.