Schlumberger
  • Home
  • Products
    • MWD/LWD/RSS/GSD System
    • Coiled Tubing Drilling System
    • Openhole Wireline Logging System
    • Formation Sidewall Coring System
    • Pressure Test & Sampling System
    • Microseismic Monitoring & VSP System
    • Engineering Logging System
    • Well Engineering Equipment
    • Production Logging System
    • PIView Software & Logging Analysis
  • Services
    • Wireline Logging Service
    • WL Testing & Coring/DST
    • MWD/LWD/RSS/GSD Service
    • Coiled Tubing Drilling Service
    • Logging Data Interpretation/Reservoir Research
    • Perforation/Cutting/Completion
    • Equipment Rental/Cooperation Service
  • Catalogs
  • Cooperation
    • Services Cooperation
    • R & D Cooperation
    • Join Us
  • About Us
    • Contact Us
    • Certificate
    • About Us
    • Market
    • Partner
  • Language
    • English
    • 中文
    • Español
    • Pусский
You are here: Home > ComLWD (GR+Resisitivity+Neutron+Density) Operation Success in Middle East
Micro-Seismic Fracture Monitoring with Downhole Hydraulic Tractor
NMR-M 1D/2D Interpretation Service
Reservoir Characterization Tester successfully operated with pipe conveyed logging in Middle East
RSS/LWD operation in Daqing Oilfield, China
Microseismic Fracturing Monitoring in Daqing Oilfield
Microseismic monitoring by MagnetVSP in hot dry rock well
RSS/LWD operation in Daqing Oilfield, China
Micro-seismic Real-time Monitoring
Tubing Conveyed Perforation (TCP) Operation in Afghanistan
Wireline Pipe Conveyed Large Size Mechanical Sidewall Coring Job
Successful VSP Job
Logging-While-Fishing (LWF)
A Successful Wireline Well Testing & Sampling Job
4.75 in. LWD FULLSET (MWD/GR/Resisitivity/Neutron/Density) services continue drilling 1043 m in Middle East
A series of successful jobs for National Day 70th Anniversary (September 30 to October 6)
8588 m Asia Logging Record
LWD Records
Formation Testing TLC job under tough situation
Walkaway job by SlimVSP
Downhole Tractor Record
Print

ComLWD (GR+Resisitivity+Neutron+Density) Operation Success in Middle East

On March 31st, 2017, in Middle East, our team has carried out a successful job of PI Integrated LWD system in 6.25 in. hole with total depth of 4030 m and logging interval of 500 m. This is first time for us to run Logging-While-Drilling (LWD) Neutron and Density in Middle East market.


© 2015 - 2025 All rights reserved. 京ICP备15009864号-1 | 京ICP备15009864号-2